Current Stage
The 100 has moved beyond the concept and design phase. Its system architecture, logic flow, and analytical framework have been fully defined.
We’ve completed extensive real-time observations and multi-decade backtesting to refine our core hypotheses. These insights are now being translated into executable code.
Development is actively underway, with a live, operational version of The 100 expected within the next 8 to 12 months.